Step 3: Test eyewash unit
1. After completing installation, test the eyewash station for proper
operation by pulling down the tray. Check for proper water
flow and quickly close the tray. Visually inspect the eyewash
unit weekly for cleanliness and proper solution level (per ANSI
Standard Z358.1-2009). When the water level drops below the
15-minute fill line, the tank must be emptied and then refilled. To
refill the eyewash tank, follow the procedures outlined in Step 2
found on page 4.
2. Attach the eyewash inspection tag (supplied) to the eyewash unit.
This tag is to be used for weekly inspection documentation. Hook-
and-loop fasteners are provided to attach the tag to the unit.
3. If the eyewash unit is not working properly, remove it from the
hazard area and contact Bradley Corporation immediately.